Back in March 2003 construction began. Five 4' X 8' chipboard sheets
were laid on home made tressles. The track was designed but adjustments
were made when in the construction. A bridge was constructed
from wood and hardboard.
Six power supplies were used, one
for each lane. Each lane was then connected in six places to
avoid power loss around the circuit. The track was fully landscaped
and populated with models. We decided to set the year of the
model to 1975.
Above:- Simon
and Kev fix the track down while Steve er supervises.
Left:- Garry
works on the track and I cut track borders out of hardboard.